Culvert construction notices

2024-04-17


before culvert construction, prepare related materials, equipment and personnel to enter, work safety protection and well construction period, subgrade slope protection , prevent objects such as stones fell hurt.

Cculvert construction matters needing attention:

1, before culvert construction, prepare related materials, equipment and personnel to enter, work safety protection and well construction period, subgrade slope protection , prevent objects such as stones fell hurt.

2, foundation treatment, can be backfilled gravel or laying concrete. To smooth the basement, replacement of 30-50cm thick gravel material, density reached above 90%, the choice of appropriate water about 3% longitudinal slope. Set each culvert centerline and sideline.

3, steel corrugated culvert construction, using the method of segmental construction, advance in the original Arch Culvert Base with angle steel side by side, according to the length of culvert length determination. As the rail steel culvert propulsion, corrugated culvert pipe diameter can have different specifications according to the need of engineering, self-contained tube diameter is 0.5m--2.5m; each pipe length of 3 meters. Using internal (external) flange bolt connection. Assembled culvert pipe diameter 3m--8m. The circumferential direction of each 4---15 block plate, plate with high strength bolts fastening plate.

4, if the culvert length less than 30 meters, on both sides of corrugated metal culvert and the original culvert width is greater than 80cm, can be the whole corrugated metal culvert propulsion, to end in the downstream or upstream in place later, then end of masonry retaining wall, surrounded by backfilling work, can the backfill gravel, gravel soil, masonry rubble, top with mortar rubble or high pressure pump expansive cement mortar.

5, if the culvert length greater than 30 meters, the steel corrugated pipe culvert sides with the original culvert width is less than 80cm, 3m-6m can be long culvert propulsion, to end in the downstream or upstream in place, can be fixed, piece of stone masonry top end wall, spacing and the other end of the steel corrugated pipe culvert culvert between with sandbags or mortar rubble blocked, width of 50cm, and then start the backfill. Both sides can be used coarse watertight compaction or pouring concrete vibrators tamping; top with high pressure pump expansive cement mortar. After finished the section tube around the filling, the second sections of pipe are connected to, two tube, connection mode for corrugated pipe culvert in the steel flange bolts, workers can be connected in a pipe. The connection is completed, with the method of the same backfill. In this order, complete the whole metal corrugated culvert construction work.

Keywords:

Corrugated Steel Pipe Culvert

Related information


Treatment methods of various soil-based foundations during the installation of steel bellows

Steel corrugated pipe culverts have the advantages of thin joints, light weight, simple construction technology, and easy on-site installation.In the installation process of steel bellows, the foundation is essential.The foundation should maintain a uniform bearing capacity for the entire steel corrugated pipe culvert, and the foundation where the weak foundation and the rock foundation intersect should be avoided. If it is unavoidable, high-quality sand and gravel should be compacted and formed with a thickness of at least 30 cm to minimize the amount of settlement in the tunnel culvert.This article analyzes and explains the treatment methods of various soil-based foundations during the installation of steel bellows.

2024-04-17

Congratulations to Qijia Group for the successful holding of the 2023 groundbreaking conference

On the sixth day of the first month of 2023, Qijia Group held the 2023 groundbreaking conference at Kunlun Hotel.In the new year, we are all dream chasers, and the road to the future is long. May you and I work together and walk hand in hand to welcome a more exciting year together.I wish you all a happy start to work, safe and healthy.

2024-04-17

Focus on the economic situation in the third quarter 丨 Xinhua Time Review: China is still a hot spot for foreign investment

The Sixth China International Import Expo is approaching, and China has once again gathered the eyes of the world.The exhibition area of enterprises has increased by about 30%, and the number of exhibitors of the world's top 500 and leading enterprises in the industry has exceeded the previous level. More than 400 new products, new technologies, and new services will be unveiled, demonstrating the attractiveness of the Chinese market and the new vitality of high-quality development from one side.

2024-04-17

Get a quote